Pineville, SC
Approx. Contract: $1,086,500
Market: Utility/Industrial
The Cross building is a wastewater treatment building that consists of an electrical room, control room, wet lab, dry lab, breakroom, offices, women’s restroom and men’s restroom.
Scope of work: Installation of new heating, ventilation, and air conditioning (HVAC) equipment
Labor hours: 2,206
Equipment:
26 electric Greenheck wash-down heaters
2 electric Greenheck duct heaters
9 louvers
13 Greenheck exhaust fans
4 Greenheck gravity ventilators
4 variable air volume boxes (VAVs)
7 Johnson Controls air handling units (AHUs)
Subcontractors:
Johnson Controls – automatic temperature controls
Easy Way Insulation Co., Inc. – HVAC insulation
Addison Energy Technologies, LLC – testing & balancing
.